工艺流程:
technological process:
◆ 钢筋加工和钢筋笼制作:钢筋冷拔,切断,弯曲和绑扎
◆ reinforcement processing and reinforcement cage production: reinforcement cold drawing, cutting, bending and binding
◆混凝土配料、搅拌系统:混凝土配料与搅拌
◆ concrete batching and mixing system: concrete batching and mixing
◆ 电线杆成型:离心发成型圆形电杆(需要离心机、模具和布料机等设备),或震动成型其它类型电杆(需要布料机、震动台、模具等设备)
◆ pole forming: centrifugally shaped round pole (equipment such as centrifuge, mould and distributing machine is required), or vibration shaped other type pole (equipment such as distributing machine, shaking table and mould are required)
◆ 蒸汽养护:新成型电杆带摸静停一段时间,进入蒸汽养护室,养护几小时
◆ steam curing: the newly formed electric pole stops for a period of time and enters the steam curing room for several hours
◆ 脱模和养护:电杆带模出养护室,脱模,清模,脱模的电杆继续保湿或泡水养护一段时间
◆ demoulding and maintenance: the pole is taken out of the maintenance room with mold, demoulded, cleaned, and the demoulded pole is kept moist or soaked for a period of time
模具的投资较大,生产效率决定于模具周转率。
The investment of mould is large, and the production efficiency depends on the turnover rate of mould.
生产水泥电线杆是在一定转速(产生足够的离心力,使水泥料形成中间空的电线杆)的钢模中用蒸汽养护而成。钢模是两个半模合成的,以便加料与取出成品。因此在成形之前需要对电线杆钢筋骨架(钢筋笼)的制作与符合比例要求的水泥料浆(水泥+石子+砂+水)的混合搅拌,因此其生产制作原理是简单的,但需要一定的吊运设备、场地及一定的机械设备。
The production of cement poles is made by steam curing in a steel mould with a certain rotation speed (generating enough centrifugal force to make the cement material form a middle empty pole). The steel mould is composed of two half moulds for feeding and taking out the finished product. Therefore, before forming, it is necessary to mix the production of reinforcement framework (reinforcement cage) and cement slurry (cement + stone + sand + water) that meet the proportion requirements. Therefore, the production principle is simple, but it requires certain lifting equipment, site and certain mechanical equipment.